The building infrastructure has to be equipped with highly available technical equipment and to ensure operation around the clock, 365 days a year. It is the coordination centre for the national and supra-regional transport of electricity in Austria’s high-voltage grid and supergrid (110kV, 220kV, 380kV).
APG – Austrian Power Grid AG
Austria
2006 - 2009
Building services design, structural design, site supervision (energy technology), site supervision (building services), infrastructure planning (data centres)