Energy Efficiency in Public Buildings in the City of Chernivtsi, Ukraine

Project objectives

The overall objective of the project was to implement energy saving measures in municipal buildings in the city of Chernivtsi

Client

Nordic Environmental Finance Corporation (NEFCO)

Location

Ukraine

Duration

02.2015-08.2015

Services

Baseline study / Technical assessment of buildings; Training and capacity building; Assessment of alternative energy sources; Benchmarking of buildings’ energy performance; Socio economic context; Conceptual design; Definition of Priority Investment Programme and development of a long-term strategic Investment Programme; Financial projections and implications for the City budget; Procurement support

Project description

The assignment focused on preparation of a comprehensive Feasibility Study, providing solutions to reduce consumption of electric and thermal energy to improve the comfort level, meeting objectives of the city’s long-term strategy and complying with specific requirements for grant financing, debt service coverage and financing through internal cash generation

Project data

After evaluation of 51 buildings, 33 buildings (including 9 historical) have been approved by the City for the Priority Investment Programme: schools, kindergartens, the policlinic and the hospital. The project aimed to improve the learning environment and classroom conditions of more than 14,000 pupils

Project specifics

  • Building envelope: Thermal insulation of walls, roofs, attic floors, and ground floors; replacement of windows; installation of new insulated doors
  • Heating system: Installation of individual heating substation with automatic control; hydraulic balancing / rehabilitation of heating network; installation of new heating system (alternative energy usage)
  • Ventilation systems: Installation of local decentralized ventilation systems; rehabilitation of existing central ventilation system
  • Hot water preparation: Installation of timers at electrical boilers; installation of decentralized heat pumps
  • Electricity consumption: Replacement of existing energy inefficient equipment and incandescent bulbs
  • Non energy efficiency measures: Installation of water saving taps and shower sleeves; rehabilitation of outer areas / drainage systems; Repairing of façades; rehabilitation of sloping roofs; reinstallation of emergency staircases, etc.
  • Development of the Energy Management System for the City

Services iC

  • Feasibility study
  • Priority Investment Programme
  • Conceptual design
  • Capacity building
  • Procurement support
  • Renewable energy development
  • Socio-economic analysis
  • Application for E5P financing
  • ToR for PIU Support
News & Publications

Latest News & Publications

10 April 2024

As a technical consultant, iC Ukraine provided advisory services on the reconstruction of housing for…

26 January 2024

Experts from CES clean energy solutions, iC consulenten Ukraine and Neo Eco presented common recommendations…

21 November 2023

The reconstruction of a dormitory in Lutsk allocated by the city for the settlement of…

Spelling error report

The following text will be sent to our editors:

This website uses cookies to improve your browsing experience.